News
30.12.2021
SEG LLC LLC achieved staff vaccination rate of 82% against the coronavirus infection COVID-19.
12.10.2021
SEG LLC was accredited as inspection agency of “Category A” in accordance with GOST R ISO/IEC 17020-2012 " Conformity assessment. Requirements for the operation of various types of bodies performing inspection" and SDA 17-2009: Requirements to inspection organisations.
14.09.2021
SEG LLC received an Integrated Management System Certificate of compliance with GOST R ISO 9001-2015 (ISO 9001:2015), GOST R ISO 14001-2016 (ISO 14001:2015), GOST R ISO 45001-2020 (ISO 45001:2018) in "RosTechCertification" certification system. SEG LLC received a certificate of Quality Management System compliance in Petroleum, petrochemical and natural gas industries with the requirements of GOST R ISO/TS 29001-2007 (ISO/TS 29001:2010) in "RosTechCertification" certification system.
30.08.2021
SEG LLC received a Сertificate of Management System compliance with the requirements of EN ISO 9001:2015 / GOST R ISO 9001-2015 in accordance with the procedures of TUV AUSTRIA Standards & Compliance. SEG LLC applies a Management System compliant with the above-mentioned standard in the field of "Provision of services in the field of construction control, technical supervision, technical inspections and consulting".
15.06.2021
Safety rules were implemented at workplace, on the way to and from work due to the spread of the coronavirus infection. SEG LLC achieved staff vaccination rate of 39% against the coronavirus infection COVID-19.
15.03.2021
SEG LLC started a vaccination campaign for its staff against the coronavirus infection COVID-19. According to the requirements of Rospotrebnadzor, some employees were transferred to distance work with all measures recommended by the RPN in place.
29.12.2020
SEG LLC has started to expand the list of construction and testing laboratory services. One of the most advanced methods for analyzing the elemental composition of metals is optical emission spectrometry. Our company has appropriate equipment that allows determining composition of alloys and metals of wide range of complexity, such as carbon, sulfur, phosphorus.
21.11.2019
SEG, LLC received a recognition letter from SOYUZ “ENERGOSTROY”
09.08.2019
SEG, LLC successfully certified for participation in procurement procedures of OOO “RN-Snabjenie-Nefteyugansk” up to 2021.
21.06.2019
SEG, LLC successfully passed the inspection control of AO “NTC “Promyshlenaya bezopasnost” on compliance with inspection organization requirements that were established by the Common system of compliance evaluation in the fields of industrial, ecological, energetics, and construction safety.
09.10.2018
SEG, LLC was included in the Registry of organization, whose goods, works and services comply with “Construction control on Transneft system organization sites” up to 10.05.2020.
12.09.2018
We performed a special evaluation of labor conditions. The results showed no hazardous production factors on the workplaces.
11.09.2018
SEG, LLC remained in the registry of potential procurement parties of OOO GAZPROM for the year 2019.
11.09.2018
SEG, LLC remained in the registry of potential procurement parties of OOO GAZPROM for the year 2019.
04.09.2018
SEG, LLC successfully passed the external audit of OOO “Alfa Registr” and got a certificate of conformity for its integrated management system with the ISO 9001:2015, ISO 14001:2015, ISO 45001:2018 international standard requirements.
13.03.2019
SEG, LLC successfully certified for participation in procurement procedures of OAO “NK Rosneft” for the year 2019.
01.02.2018
SEG, LLC successfully certified for participation in procurement procedures of AO “RNPK” for the year 2019.
12.01.2019
SEG, LLC successfully certified for participation in procurement procedures of OOO “Slavneft-Krasnoyarskneategaz” up to 2019.
14.10.2016
SEG, LLC remained in the registry of potential procurement parties of OOO GAZPROM for the year 2017.
06.06.2016
SEG, LLC was included in the Registry of organization, whose goods, works and services comply with “Construction control on Transneft system organization sites” up to 17.06.2018.
05.02.2016
SEG, LLC got a conclusion on organizational and technical readiness for implementation of the following works: on-site construction control (technical supervision) on construction quality, insulation coating quality, welded seam quality from OOO “Gazprom gaznadzor”.
01.09.2015
SEG, LLC successfully passed recertification audit performed by BSI in compliance with QMS.
17.08.2015
SEG, LLC started to provide independent technical supervision on capital construction and reconstruction work quality services for TPP “LUKOIL-Komi” sites for 2016 - 2017.
22.07.2015
SEG, LLC successfully spent the planned labor safety day.
02.07.2015
SEG, LLC remained in the registry of potential procurement parties of OOO GAZPROM for the year 2016.
14.05.2015
SEG, LLC starts to provide technical supervision of engineering surveys services for Russkiy field sites of OAO “Tyumenneftegaz”.
22.03.2015
SEG, LLC successfully certified for participation in procurement procedures of OAO “NK Rosneft” for the year 2015.
18.02.2015
SEG, LLC successfully passed compliance audit on ISO 29001:2010.
22.03.2015
SEG, LLC successfully certified for participation in procurement procedures of ZAO “RN - Snabjenie” for the year 2015.
12.01.2015
SEG, LLC started to provide independent technical supervision of complex engineering survey services for “MESSOYAHA” subsidiary sites for OOO “GPN-Razvitie”.
22.12.2014
SEG, LLC established partnership with OOO “AIC Group” to provide engineering services in oil and gas, civil construction, machinery, energy, and transport in Azerbaidjan.
20.11.2014
SEG, LLC successfully passed a compliance audit on ISO 9001:2000, ISO 14001:2004 and OHSAS 18001:2007. The audit was performed by The British Standart Institution Group.
19.05.2014
SEG, LLC started to provide services for quality control of project solutions, technological processes, construction materials, engineering structures, machinery and equipment that are used in Customer construction contructor's works for roof replacement on Customer's sites: MEGA UFA, MEGA OMSK, MEGA NOVOSIBIRSK for OOO IKEA MOS (Commerce and real estate).
14.03.2014
SEG, LLC succesffully certified for participation in procurement procedures in OAO “Slavneft-Megionneftegaz”.
13.03.2014
SEG, LLC succesffully certified for participation in procurement procedures in OOO “RN-Uvatneftegaz”.
07.03.2014
SEG, LLC obtained a license for surveying works.
03.03.2014
SEG, LLC started to provide technical inspection services for material and resources production of ZAO “RNPK”.
15.02.2014
SEG, LLC succesffully certified for participation in procurement procedures in ZAO “Vankorneft”.
03.02.2014
SEG, LLC succesffully certified for participation in procurement procedures in OOO “NK ROSNEFT”.
03.02.2014
SEG, LLC succesffully certified for participation in procurement procedures in ZAO “RNPK”.
27.01.2014
SEG, LLC started to provide technical supervision and inspection control services for manufacturing and shipment of power-generating machinery and materials of various applications for “RN-Snabjenie”.
22.01.2014
SEG, LLC succesffully certified for participation in procurement procedures in OAO “Varieganneftegaz”.
02.12.2014
SEG, LLC succesffully certified for participation in procurement procedures in ZAO “RN-Snabjenie”.
14.11.2013
SEG, LLC participated in Russian oil and gas summit “Prospecting and Production 2013” in “Innovational solutions and technologies” business area of Upstream segment.
14.11.2013
SEG, LLC started to provide services for on-site construction control of OAO “Taimyrgaz” sites in the north of Krasnoyarsk kray. The project to implement includes looping construction control with 720 mm diameter on gas pipeline sections from Pelyatkinskiy GCF to Severo-Soleninskiy GCF.
14.11.2013
SEG, LLC successfully passed a compliance audit on ISO 9001:2000, ISO 14001:2004 and OHSAS 18001:2007. The audit was performed by Eurasian Expert Group.
30.10.2013
SEG, LLC succesffully certified for participation in procurement procedures in OAO “Verkhneconskneftegaz”.
25.10.2013
We started partnership with OOO “Lukoil Uzbekistan Operating Company”. Our company started to provide engineering and technical supervision services for “Early gas of Kandym fields group and arrangement of northern part Shady section of 1st start-up complex” site construction. SEG, LLC selected as the ENGINEER company.
25.07.2013
Vladimir Anatolyevich Chumakov was appointed as chief executive officer of “Swiss Engineering Group” LLC.
14.06.2013
Ordinary manager meeting of on-site construction control took place in Moscow head office of SEG, LLC.
03.06.2013
As a member of non-commercial partnership with SRO NP “MOPO “OboronStroy Proekt” our company got a permit for particular types of works that impact the capital construction site security: project documentation preparation works by an entity of entrepreneur (general developer) engaged by a developer or customer on a contract basis.
30.05.2013
As a member of non-commercial partnership with SRO NP ROS “OboronStroyIzyskaniya” our company got a permit for particular types of works that impact the capital construction site security: works of engineering-geodesic, geological, hydrometeorological, ecological, geotechnical surveys, foundation soil, building and construction base condition surveys.
29.03.2013
“Business&Class” magazine publication on our company, March 2013, Yekaterinburg.
15.03.2013
SEG, LLC started to provide HSE supervision services during large infrastructural object construction project implementation on OOO “TNK-Uvat” fields.
06.03.2013
“Neft and Gas Sibiri” magazine No. 1 (10) 2013 published information on SEG, LLC.
14.01.2013
Extraordinary general meeting of company's members appointed Ahmadullin Rustam Sharifyanovich as the chief executive office of the company.
21.12.2012
SEG, LLC started to provide engineering survey technical supervision complex services for OOO “TNK-Uvat” sites.
20.12.2012
SEG, LLC got certified in NK Rosneft.
31.10.2013
SEG, LLC successfully passed a recertification audit on ISO 9001:2000, ISO 14001:2004 and OHSAS 18001:2007. The audit was performed by ACS Registrars Ltd.
05.06.2012
SEG, LLC shareholder meeting approved the annual “Industrial, Labor and Environmental Safety Status in SEG, LLC Company Group” report in compliance with established procedure of monitoring and result analysis of industrial, labor, and environment safety management system.
17.12.2011
SEG< LLC finished the construction quality and arrangement control for Yuzhnohylshuyuk oil and gas field which is owned by OOO “Naryanmarneftegaz”.
08.11.2011
SEG, LLC started independent on-site construction control services on oil pipeline system in the Eastern Region sites as part of Tengiz - Novorossiysk oil pipeline project implementation performed by Kaspiyskiy Truboprovodny Consortium.
07.10.2011
SEG, LLC successfully passed certification audits on ISO 14001:2004 and ISO 18001:2007.
29.08.2011
We consulted OOO “Enerpred Yardos” on evaluation of enterprise quality management system compliance with API Q1/ISO TS 29001:2007 requirements.
27.01.2011
We finished the independent technical inspection of manufacturing and shipment of drilling devices “BU-3900/255 ACHK-BM” from the drilling equipment plant in Volgograd for an affiliate of OAO “NK Rosneft”.
02.11.2010
SEG, LLC successfully passed certification audit on ISO 9001:2000.
23.11.2010
“Hevel” company, which is a joint venture of “Renova” company group and OAO “ROSNANO” announced SEG, LLC as a winning bidder to perform an independent on-site construction control on all stages for the biggest in Europe plant of thin-filmed PV module production in Novocheboksarsk (Chuvash Republic).
27.06.2010
We consulted “Burintech” research and development enterprise on evaluation of enterprise quality management system compliance with API Q1/ISO TS 29001:2007, ISO 9001:2000, API Spec 7-1 requirements.
15.05.2009
We consulted OAO “Uralskiy trubniy zavod” on evaluation of enterprise quality management system compliance with API Q1/ISO TS 29001:2007 requirements.
18.01.2009
On ZAO “Uralmash Burovoye oborudovanie” plant we started a technical inspection of drilling device “BU5000/320 AK-BM (CH)” and “BU4500/270 AK-BM (CH)” manufacture. We would perform shipping control for OAO “NK Rosneft” of for drilling devices sent to oil fields of Eastern Siberia.
07.12.2008
We performed for OAO “NK Rosneft” an independent technical inspection of manufacturing and shipment of “BU-3900/225 APK-BM”, “BU-3900/255 ACHK-BM” drilling devices from Drilling equipment plant in Volgograd.
24.11.2008
SEG, LLC designed and implemented an enterprise quality management system for ISO 9001:2000 certification on OOO “Tyumensky sudostroitelny zavod” and ZAO “Uralmash buruvoye oborudovanie” companies of Uraslmash machinery corporation.
12.11.2008
SEG, LLC prepared and implemented enterprise quality management system in order to get ISO 9001:2000 certification at OOO “Stromneftemash”, which is a part of Integra company group.